Commercial Projects
Heathrow Terminal 5
Apex Wiring Solutions provided a turnkey modular solution for lighting and small power throughout Heathrow Airport. The vast Heathrow Airport Terminal 5 measures over 450,000sqmtrs and with so many contractors involved and time being a key factor, it was a...
St Bart’s Hospital, London
A hugely successful 10-year modernisation project to redevelop Britain's oldest hospital, was aided with the installation of Apex Modular Wiring. The Skanska-led project at St Bartholomew's in central London, has significantly reduced its carbon emissions, lowered...
Sunshine Coast University Hospital
Sunshine Coast University Hospital is a tertiary and teaching hospital located in Queensland Australia. The project developer selected Apex to provide modular solutions which ensured the electrical services for the project were delivered on time. This was a...
Yas Marina Hotel, Abu Dhabi
Apex Wiring Solutions was recruited to develop a plug-and-play system for 4,000 colour changing LEDs covering the entire facade of the Abu Dhabi Grand Prix Hotel. With only two rope access operators, the complete install took only a few days and delivered spectacular...
Royal London Hospital
This 160000 square metre project in the heart of the capital faced a number of logistical challenges and Apex were selected to assist with this by providing modular wiring to all areas of the 727-bed Royal London Hospital. The project was delivered on time and on...
Queen Alexandra Hospital, Portsmouth
The Queen Alexandra Hospital project saw the construction of a new seven-storey building, as well as pathology and rehabilitation blocks and a two-storey car park. With over 1,000 patient beds, the main contractor delivered this project using various modern methods of...
Contact Us
St. Johns Road, Meadowfield Ind Estate, Co. Durham, DH7 8RJ.
Phone: 0191 378 7900 | Fax: 0191 378 7909
Email: ku.oc1727867411.snoi1727867411tulos1727867411gniri1727867411wxepa1727867411@ofni1727867411